How the release train works

The release train turns one eligible master revision into a versioned GitHub Release. It runs in rehearsal mode today; a later configuration change switches the same workflow to crates.io.

A train day

flowchart LR
  schedule[Scheduled slot] --> guard[Daily guard]
  guard -->|GO| ci[Full CI on exact SHA]
  ci --> update[release-plz update]
  update --> push[Fast-forward version and changelog commit]
  push --> release[release-plz release]
  release --> binaries[Linux and macOS archives]
  guard -->|SKIP| done[Wait for next slot]

The workflow has two UTC schedule slots. The second is a retry if the first found a failure or a push race; after a release, the daily guard makes it a no-op. A manual dispatch can run the same workflow or request a dry run.

Why this design

The release-plz quickstart publishes on every push, which does not impose a daily ceiling. Replacing push with a cron still does not prevent a same-day retry from publishing twice. A release pull request with a scheduled merge adds a persistent, rapidly changing PR and a merge flow this repository does not use. An hourly guarded publisher adds frequent runs without improving the release decision.

The research report also rejected cargo-semver-checks for this project because src/lib.rs is an internal seam rather than the product contract. cargo-dist packages and distributes binaries; it does not replace release-plz's version and changelog work. See the release-train decision record.

What once a day and green mean

The ceiling uses the calendar date in America/New_York, not a rolling 24-hour window. The guard compares the most recent release date with today's New York date. A prior-day release permits a run; a same-day release skips it unless a non-empty hotfix reason is provided.

Green means the reusable CI workflow passed in full for the exact SHA selected by the guard. The release workflow passes that SHA to CI and checks Linux and macOS. It does not accept an earlier green master run as evidence for a newer revision.

The rehearsal guard uses the newest GitHub Release creation time. Live mode uses the crates.io sparse index publication time, including yanked versions. The registry timestamp matters because a successful publish is permanent even if creating its tag or GitHub Release later fails.

The bump commit and the push race

After full CI passes, release-plz updates Cargo.toml and CHANGELOG.md. The workflow commits those generated changes with the GitHub Actions bot identity and pushes with fast-forward-only semantics. The commit contains version and changelog metadata; the source revision that was checked remains the code being released.

An agent can push to master after CI starts. If that makes the release bump no longer a fast-forward, Git rejects the push and the run ships nothing. The later schedule slot then plans from the newer master revision and runs CI for that SHA.

Rehearsal, live publishing, and Trusted Publishing

release-plz.toml currently sets git_only to true. Rehearsal creates Git tags and GitHub Releases, but does not publish to crates.io. To go live, the configuration changes to git_only = false. The guard then reads crates.io publication times instead of GitHub Release times.

The live workflow grants the release job contents write and id-token write in the release environment. release-plz performs the Trusted Publishing OIDC exchange; the workflow does not store or pass a crates.io API token. Trusted Publishing must be configured for owner bobs-org, repository bob-cli, workflow release.yml, and environment release. The first crate publication must be done manually because Trusted Publishing cannot create a new crate.

One-way doors and operating costs

Once published, a crates.io version cannot be replaced or deleted. The package name bob-obsidian is public and permanent, and the 10 MiB upload limit is a hard cliff. Yanking a version does not undo its publication timestamp or reopen that day's guard.

Publishing is separate from deployment: Bryan's hosts and companion repositories track bob-cli master, so a release may lag their source by up to a day. The train also has a push race and waits for the full Linux and macOS gate, which takes about 20 minutes including workflow overhead.

About one month after the first live release, review crates.io downloads. If there are no outside users, consider a slower crates.io cadence while keeping GitHub Releases useful. If the package reaches the 8 MiB warning threshold, review its contents; splitting large embedded assets into a separate crate is an explicit future design choice.

Tested rolling snapshot bob-cli 41afa14 bob-mac-capture 556bb67 bob-plugins af1e691 Built 2026-10-24T22:34:13Z (zensical) build.json